MGM Dubai Slips to 2029, Giving Wynn an Extra Year in the UAE
MGM's 1,500-room Dubai resort with Wasl slips to early 2029, a second delay in 18 months, while Wynn Al Marjan opens September 2027 into an $8.5B market.

MGM Resorts' Dubai resort will now open in early 2029 — its second delay in roughly 18 months, and a slip of about a year from the March 2028 guidance CEO Bill Hornbuckle gave investors in February.
Ari Kastrati, MGM's chief content, hospitality and development officer, announced the new timeline alongside Dubai developer Wasl as the project topped out structurally. Neither party explained why the date moved. That silence follows a pattern: on the first-quarter 2025 earnings call, Hornbuckle said the resort would be ready in the third quarter of 2027. On the first-quarter 2026 call, he said the project "remains on schedule." MGM didn't mention Dubai at all on its second- or third-quarter calls this year.
What's actually being built?
The project is a 280,000-square-meter island resort next to the Burj Al Arab. It stacks three MGM brands — MGM, Bellagio and Aria — into one property with 1,500 rooms and 40 restaurants, plus a beach club, a theater, retail and wellness facilities.
The ownership and management structure matters here. MGM runs the resort under a non-gaming management agreement with Wasl Hospitality, the Dubai developer's hospitality arm. MGM isn't the owner; it's the operator, which means its economics hinge on management fees rather than asset returns — and on whether gaming ever enters the picture.
That question is live. MGM is holding 23,000 square meters of space on a podium floor for a potential casino. But Hornbuckle said in April that MGM still hasn't heard whether gaming will be permitted in Dubai. Until regulators answer, that space is a reserved bet, not a revenue line.
What does the delay change for Wynn?
Plenty. Wynn Al Marjan, the UAE's first licensed integrated casino resort, is set to open in September 2027 and already holds a gaming license. MGM's slip to early 2029 hands Wynn roughly 17 months as the market's only integrated resort operator — first-mover advantage in a market CBRE estimates at upwards of $8.5 billion.
To put that number in context: $8.5 billion would put the UAE on par with mature gaming jurisdictions, an outsized figure for a market that currently has zero operating casino resorts.
The gap also shapes the non-gaming competitive math. When MGM's three-brand complex finally opens in 2029, Wynn will have had time to lock in premium hotel demand, F&B patterns and event bookings in the northern Emirates before a 1,500-room competitor enters — though the two properties sit in different emirates and won't compete for the same beachfront foot traffic.
For MGM, the structural topping-out at least signals physical progress behind the calendar shuffle. The company now has to wait on two things it doesn't control: Wasl's construction timeline to hold at 2029, and Dubai's regulators to rule on whether that 23,000-square-meter podium floor ever becomes a casino floor.
More from Olivia Hart
Show full bio
Staff writer covering regulation, policy and their impact on Restaurant and hotel operations at The Pass Brief.
757 articles

