Development & Finance

Marriott, Hyatt, Wyndham and Accor Cut 2026 Room Growth Forecasts

Four of the largest hotel groups have trimmed 2026 net rooms growth forecasts since late July, as U.S. supply grew just 0.4% in the third quarter and exits outpace openings.

Construction Delays and Exits Force Hotel Giants to Cut Room Growth Forecasts
Construction Delays and Exits Force Hotel Giants to Cut Room Growth Forecasts — TuendeBede / pixabay

Four of the world's largest hotel companies have cut their 2026 net rooms growth forecasts since late July. Marriott, Hyatt, Wyndham and Accor all trimmed their targets. Hilton held its 6% to 7% goal, but its third-quarter growth of 6% missed the 6.3% consensus, and the company now needs a surge of fourth-quarter openings to stay inside its range.

The cuts land on the industry's most closely watched metric. Net rooms growth is one of the two main drivers of fee revenue at asset-light hotel companies, alongside revenue per available room. When openings slip or exits rise, the fee engine slows with them.

All of these groups report record development pipelines. The pipelines are not converting into open hotels on schedule. Rooms are also leaving the systems faster than operators planned.

Why are openings falling short?

The causes differ by company, and the details matter.

  • Marriott cited construction delays in the Middle East.
  • Wyndham pointed to terminations of substandard rooms and a more than 30% drop in economy and midscale hotel transactions that normally trigger conversions.
  • Accor faces franchisee closures in China, where economy and midscale hotels are shutting faster than expected. The company's CFO said the cut "is all China."
  • Hyatt is among those that trimmed its forecast, though it expects a more even growth pace in 2027.

The pressure comes from both ends of the ledger. Construction delays and rising costs slow new supply on one side. Higher-than-planned exits, including Wyndham's quality terminations and Accor's China closures, drain rooms from the other.

How weak is U.S. supply growth?

The numbers are unusually low by historical standards. CBRE reported that U.S. hotel supply grew only 0.4% in the third quarter, year over year. CoStar forecasts 0.6% growth for 2027. That compares with a historical average of 1.6% a year since 1989. In plain terms, the industry is running at roughly a third of its long-run pace of capacity expansion.

The conversion market, normally a faster route to new rooms than ground-up construction, is jammed. The conversion backlog reached 146,544 rooms, nearly double the comparable 2019 period. A backlog that large suggests signed deals waiting on financing, renovation and brand standards — not demand.

What do construction economics look like?

The math for new builds has deteriorated sharply. Tyler Morse, CEO of hotel owner-developer MCR, said construction costs are up about 50% over five years. He cited a wood-frame Home2 Suites in Nevada now costing $250,000 a key.

That figure frames the problem. A limited-service product at half a million dollars per room for a two-key build would strain most pro formas. Rising interest rates add further pressure on the financing side.

Who is the exception?

IHG stands apart from the group. The company backed consensus of about 4.8% net system growth and called it its fifth straight year of acceleration. No other major operator in this set made a comparable claim.

Hyatt is also working the problem from an operational angle. The company is using AI to draft property improvement plans, cutting turnaround from several weeks to a single day. Faster improvement plans can accelerate franchisee conversions, though the company has not quantified how many rooms the tool will add.

What happens next?

The near-term picture stays soft. Record pipelines sound reassuring, but a pipeline is a promise, not a room. Until construction costs and interest rates ease, and exits slow, the large franchisors will keep leaning on RevPAR growth to carry fee revenue — and 2027's forecast of 0.6% U.S. supply growth suggests the lean continues at least through that year.

Hotel DevelopmentNet Rooms GrowthConstruction CostsHotel ConversionsFranchise Expansion

More from Marcus Bennett

Marcus Bennett

Show full bio

Market editor covering technology and product news in Restaurant and hotel operations at The Pass Brief.

829 articles

Pairings

« Previous articleNext article »